|
|
Intro Construction Calibration Documentation Contact |
Dosing Pump CalibrationCalibration
pot is usually installed on suction site of dosing pump.
It should be equipped with isolated valves to enable calibration directly from calibration pot and after calibration switch over to normal flow direction from chemical feed tank.
To check
dosing pump rate isolate the chemical inside the calibration pot, leave valve
#3 close and valve #2 fully open. Start the pump for one minute operation and observe the number of marks on the scale the fluid passed.
This value provides
actual metering pump performance per minute for particular chemical its
concentration and discharge conditions. |
|